Project: The owner wished to reduce the regulatory compliance efforts associated with underground fuel storage and optioned for an above ground tank system to supply fuel for its fleet fueling location.
Challenge: Aboveground piping is usually protected by placement on adjacent structures; however this design required the piping to be supported mid-air between the AST and the fuel island. Insuring the piping could not be damaged by errant vehicle traffic; additional protective devices were required to be installed.
MJK Solution: MJK fabricated pipe stands to provide support to the piping and shortened the recommended spacing on concrete filled bollards to insure the piping remained protected.