Case Studies Studies in continually exceeding expectations

Retail Fueling

Well accomplished in the retail fueling market, MJK has installed some of the largest single site fueling facilities in California and Nevada. From multi-tenant, 96 dispenser facilities to small 3 dispenser installations, MJK has a tremendous amount of experience in this arena.

Trucking industry, car rental and general retail fueling clients, find that MJK’s broad experience in retail fueling provides them with a sole source for timely, professional services.

Case Study: Love’s Truck Stops - Retail Fueling

case-study-loves

Project: Install truck and automotive fueling facilities at a new development site.

Installation at large retail fueling facilities is a specialty for MJK as our crews have built some of the largest retail fueling facilities in the west.

Another example of our capabilities in large scale fueling facility development is this six automotive and eight truck fueling point facility which is furnished by two 20,000 gallon USTs and four 12,000 gallon aboveground storage tanks. MJK performed all excavation and installation work for all fueling related equipment and systems.

Case Study: Consolidated Car Rental

case-study-consolidatedcarrental

Project: This award winning 80 acre, $170 million facility, located 3 miles from McCarran International Airport represents one of the most convenient and advanced car rental centers in the nation. The goal of this facility was to position eleven (11) major car rental companies in one location to reduce traffic at the main terminal, eliminate the need for each company to operate and maintain its own shuttle fleet, and simplify the rental and return process for travelers. The fueling installation consisted of six separate facilities in three separate areas around the property, six (6) 30,000 underground fuel tanks and ninety-six (96) dual hose dispensers.

Challenge: The sheer size of this project and the coordination required with ongoing construction, multiple contractors and hundreds of workers made this project an exciting challenge for the staff and crew of MJK. Scheduling delivery of materials to the congested worksite, and timing of activities across the three project locations required precision and advanced planning. The encounter of hard rock material in the excavations presented the only real obstacle to progress.

MJK Solution: Working closely with suppliers, MJK performed frequent parts inventories and coordinated deliveries with projected scheduled events. MJK placed storage containers at the site to stage incoming materials and parts in a readily accessible location. Frequent meetings between all contractors working on the site assured that communication of activities was maintained at all times. MJK crews performed similar work at each location to minimize mobilizations in and out of the project, and create consistency of progress across all three locations. There are very few contractors who could handle the scope of this project. MJK is proud of this accomplishment.

Case Study: Costco - Retail Fueling

case-study-costco

Project: Install automotive fueling facilities at a new development site. Installation at large retail fueling facilities is a specialty for MJK as our crews have built some of the largest retail fueling facilities in the west.

Another example of our capabilities in large scale fueling facility development is this six automotive fueling point facility which is furnished by two 20,000 gallon USTs MJK performed all excavation and installation work for all fueling related equipment and systems.